The daily power generation can meet the needs of nearly 4,000 households! The world's highest photovoltaic project officially connected to the grid for power generation

Author:    Release Time:2024-07-01

The world's highest altitude

Caipeng photovoltaic power station is connected to the grid for power generation

The world's highest altitude photovoltaic project-Tibet Caipeng photovoltaic project was officially put into operation this morning. The daily power generation of this project can meet the electricity needs of nearly 4,000 households. How does the Tibet Caipeng photovoltaic project generate electricity?

Explore digital control

Empowering project construction in high-altitude areas

As my country accelerates the construction of new energy in high-altitude areas, some projects are also actively exploring digital construction to help new energy projects with efficient construction and intelligent operation and maintenance.

Through the engineering panoramic information management system, the engineering construction information and the operation of on-site equipment are displayed through "images" and "charts", realizing the digital control of the entire process from the project construction period to the operation and maintenance period.

Xiang Fuquan, head of the Huadian Qushui Chabala photovoltaic project: The system covers the core key elements of engineering management such as on-site control, material supply, and resource investment. Management personnel can control the key elements of the project in real time, and can also help staff to eliminate abnormal conditions and control risks in a timely manner.

Staff enter the section of the corresponding time period through the link and check the corresponding image data. Staff can adjust the management method and resource investment in a timely manner based on these materials. At the same time, panoramic photos, videos, pictures and other materials taken by drones can be used to track and record the entire process of the project.

Xiang Fuquan, head of Huadian Qushui Chabala Photovoltaic Project: The "eye in the sky" on our system is composed of multiple monitoring units and security system software to realize the functional requirements of real-time monitoring of on-site safe construction. The security system software can view the images of the designated monitoring unit in real time to supervise the safety and process of the operation. Through the data collection of the cockpit, it can also realize the monitoring of the transportation status of materials and vehicle positioning.

Such a system can not only realize the management during the construction period, but also after the project is put into operation, the staff can also use the system to monitor and track the operation of various equipment on the project site in real time, and realize full digital safety operation and maintenance. It will also provide useful experience for the subsequent intelligent and digital construction of new energy projects in high-altitude areas.

Photovoltaic dream of Tibetan girls

The effective development of solar energy resources in high-altitude areas not only provides new employment and income channels for local people. At the same time, it also gives many local children new goals for the future.

Xi Ruosangmu, 24 years old this year, is from Langkazi County, Shannan, Tibet. At present, she is an employee of the Caipeng Photovoltaic Project.

Xi Ruosangmu, deputy duty officer of the operation and maintenance of the Huadian Tibet Caipeng Photovoltaic Project: I graduated from high school in 2018. My sister was also in school at the time, so I could only go back home to help my parents with farm work and do temporary work.

Just when Xi Ruosangmu was confused about the future, she heard that there was a Caipeng Photovoltaic Project in preparation in the local area that was recruiting people, and she thought she could give it a try.

Xi Ruosangmu, deputy duty officer of the operation and maintenance of the Huadian Tibet Caipeng Photovoltaic Project: There is no need to pay tuition, and living expenses can be solved. After graduation, I will directly go to the company for employment. When I heard such news, I was very happy in my heart, and then I signed up.

After passing the registration review, Xi Ruosangmu, like 14 other children from agricultural and pastoral areas, went to Sichuan Water Conservancy and Hydropower Vocational College for a two-year study. When the reporter saw her again, Xi Ruosangmu was already an operator of a photovoltaic power station.

In order to help these children adapt to their jobs faster, the company also arranged skilled "masters" to provide "one-on-one" assistance, opened night schools, and used theoretical + practical teaching methods to help everyone quickly master work skills and even be independent.

Xi Ruosangmu, deputy duty officer of the operation and maintenance of the Huadian Tibet Caipeng photovoltaic project: At present, I have also passed some relevant certificates, intermediate workers, and dispatching qualifications, and can independently undertake the operation of most power stations.

From the daughter of a herdsman to an electric power technician, the photovoltaic project not only gave Tibetan youths like Xi Ruosangmu a stable job, but also gave them new goals.

Xi Ruosangmu, deputy duty officer of the operation and maintenance of the Huadian Tibet Caipeng photovoltaic project: I also feel that I have not only learned a skill, but also have a better dream because of this job. I hope to make more progress in the power industry in the future, contribute to my hometown through my own efforts, and light up more lights in my hometown.

(Reporters Zhu Jiang, Zhang Wei, Gu Junling, Li Xu, Tibet Station)